COMMERCIAL PROJECTS

Menu
Whitstable & Seasalter Golf Club

CLIENT: Whitstable & Seasalter Golf Club
PROJECT: Construction of New Club House
VALUE: £1.1 Million
LOCATION: Collingwood Road, Whitstable, Kent
DURATION: 52 Weeks

DESIGN: Keith Cattell / Taylor Roberts Architects

CONTRACTOR: Abbots Construction Limited

STRUCTURAL ENGINEERS: BSF Consulting Engineers

Cyril Orchard Group were employed as quantity surveyors and projects managers for the construction of a new clubhouse to replace the existing clubhouse where facilities had become inadequate to cater for the current membership. 

A new clubhouse was designed to provide a modern building providing larger, updated accommodation which would attract further playing members and provide larger function facilities. 

The building was designed to use natural light to its full potential by having a large glazed frontage facing west over the golf course. This allows the membership to view the setting sun as it goes down behind the golf course.

Cyril Orchard Group acted as quantity surveyors and project managers overseeing the construction of the building to completion.

Hadley Park House Hotel

CLIENT: Hadley Park House Hotel, Telford, Shropshire
PROJECT: 10 Bedroom Extension and Function Suite
VALUE: £1.05 Million
LOCATION: Telford
DURATION: 9 Months
DESIGN: Inside Out Architecture and Interiors Ltd.
CONTRACTOR: McPhillips

The work at Hadley Park House Hotel comprised the construction of a two storey all en-suite ten bed block linked to the existing 18th Century hotel by a single storey function suite.

 

The existing toilets inside the hotel were altered extensively to provide high quality facilities including full disabled access. Additional car parking areas were constructed.

 

The contract was the JCT Intermediate form with Contractor’s Design Element. The total construction cost was slightly in excess of £1 million.

The Creative Foundation

CLIENT: The Creative Foundation
PROJECT: Folkestone Properties
VALUE: up to £2 Million
LOCATION: Folkestone
DURATION: Various

Cyril Orchard Group have been engaged by The Creative Foundation since 2006 and have provided building and quantity surveying services among a range of other professional services.


We have been involved with over 20 refurbishment projects providing both residential and commercial facilities within existing structures.


The Creative Foundation have been fundamental in redevelopment of these run-down areas of Folkestone.

51 The Old High Street

CLIENT: The Creative Foundation
PROJECT: Refurbishment/Extension Works
VALUE: Approx. £300,000.00
LOCATION: Folkestone
DURATION: 28 Weeks 
DESIGN: Foster Gearing / Cyril Orchard Group

Cyril Orchard Group was commissioned by the client to act as project managers and CDM co-ordinators for this project with large input on the buildings design. Services included obtaining statutory permissions monitoring project finances with regular valuations and ensuring a smooth handover upon completion.

The ground floor shop was specifically fitted out for a local tattoo artist including clean environment, disabled access and additional hygiene equipment. The high ceiling to the rear of the shop creates a dramatic setting for further genre of artistry in the creative quarter.

The first floor studio is an airy yet functional space with kitchenette an W.C facilities and a stunning view over Mill Bay.

The second floor flat includes substantial kitchen, 2 bedrooms and a wealth of storage not to mention the iconic spiral stair which leads to the living room above.

The third floor living room was constructed to provide a light, open living space with panoramic views of Folkestone Harbour. The habitable room gives the flat a unique and flexible living arrangement to be enjoyed by future tenants.

The Quarterdeck

CLIENT: Hythe Bay Seafood Restaurants Limited
PROJECT: Fit out of an Ground Floor Commercial Space to Provide a New Restaurant & Kitchen
VALUE: £400,000.00
LOCATION: Deal, Kent
DURATION: 12 Weeks

DESIGN: Paul Young Restaurant Interiors

Cyril Orchard Group was commissioned along with Paul Young Restaurant Interiors to fit out the ground floor of a building to form the new Deal branch of the Hythe Bay Restaurant chain.

Cyril Orchard Group acted as quantity surveyors on the project overseeing payments to the contractor as well as organising the kitchen fit out and installation of the new mains services. The main restaurant was carried out by Paul Young Restaurant Interiors.

The restaurant fit out required extract/intake fans and duct work and Cyril Orchard Group applied for planning consent for external grills/alterations that were required for this installation. We also organised the applications and installation of the gas/electric mains and meters required to serve the new restaurant and kitchen.

T.J Vickers Limited

CLIENT: T.J. Vickers Limited
PROJECT: New Workshop and alterations and refurbishment of existing Showroom.
VALUE: £905,000.00
LOCATION: Trench Road, Telford, Shropshire
DURATION: 52 Weeks 
DESIGN: Hawkins McGowan Architects

CONTRACTOR: AM Griffiths & Sons Limited

Cyril Orchard Group were employed as quantity surveyors and CDM co-ordinator for the construction of a new workshop, alterations and refurbishment of the existing car showroom.

The existing combined showroom and workshop had become inadequate to cater for the current expansion of the franchise. The showroom was designed to provide modern, more appealing and lighter area for the display of new vehicles.  

The frontage to the showroom was designed with large opening doors to facilitate ease of access and full natural lighting to its full potential. The new workshop, to the rear of the property, along with extensive external parking areas to provide easy access for servicing, parking of vehicles.

Cyril Orchard Group acted as quantity surveyors and CDM co-ordinators overseeing the construction of the building to completion.

Hampshire FA Headquarters

CLIENT: Hampshire FA 
PROJECT: Extension to Existing Building 
VALUE: £340,000.00
LOCATION: Basingstoke
DURATION: 26 Weeks

DESIGN: Cyril Orchard Group

CONTRACTORS: C.R Richardson Limited

Cyril Orchard Group were commissioned to extend the existing Hampshire FA Headquarters to provide new conference/office facilities. The brief was to design the extension to obtain planning and building regulations consents, produce tender documentation, issue tenders to contractors, recommend a suitable contractor and supervise construction to completion. 

As well as building surveying services Cyril Orchard Group provided quantity surveying services which included tender reports, valuations and cost reports to ensure the contract was within budget.

Get in contact

For any questions on our commercial projects and the services we provide call us today or email us and one of our team members will be in touch

Folkestone Office:
Telford Office:
01303851000
01952608445

Office Hours: Monday - Friday 08:30am to 05:00pm

bottom of page